Shri Dharmendra Pradhan Dedicated HPCL’s VVSPL Capacity Expansion Project to Nation

by Shrutee K/DNS


HPCL’s Visakh – Vijayawada – Secunderabad Pipeline (VVSPL) of 572 Km length with an installed capacity of 5.38 MMTPA has been recently expanded to 8 MMTPA with construction of 3 intermediate booster pump stations at Malle Bhupala Patnam near Narsipatnam (Visakha district, AP), Jeelakarragudem near Eluru (West Godavari District, AP) and Bogaram (Yadagiri district, Telangana). The project was completed within time and approved cost of Rs.407 Crores. This low cost expansion has been done to assist evacuation of ongoing Visakh Refinery Expansion project (from 8.3 MMTPA to 15 MMTPA) additional production.

During the visit of HPCL’s Visakh Refinery on 09th November 2019, Shri Dharmendra Pradhan, Minister of Petroleum & Natural Gas and Steel, Government of India, has dedicated the project to the nation. The remote starting of these 3 station pumps from Visakh Master Control station and simulation display of advanced Pipeline Intrusion Detection System (PIDS) installed in HPCL pipelines are the notable features reviewed by the Hon’ble Minister.  This new PIDS technology will provide pipeline security with 24x7 automated surveillance system, and thus will enhance the safety and integrity of pipeline operations.

Comments

Popular posts from this blog

सभी माओं को सुष्मिता सेन का संदेश: अब 'हाँ' अधिक बार कहिये

World’s 1st Tech-Enabled Courier Papers N Parcels Launched by 13-year-old Tilak Mehta

Mayor praises the footballing talent of Mumbai as he announces young stars will travel to London